You are here

DeepCHALLA-Lake Challa Drilling Project (DCH)

Project Locations

Hole ID Original ID Date Water depth (M) Elevation (M) Depth top (M) Depth bottom (M) Region
DCH-CHL16-10A November 6, 2016 75.00 847 0.00 0.39
DCH-CHL16-11A November 6, 2016 85.00 847 0.00 0.43
DCH-CHL16-12A November 6, 2016 80.00 847 0.00 0.42
DCH-CHL16-13A November 6, 2016 70.00 847 0.00 0.40
DCH-CHL16-14A November 6, 2016 65.00 847 0.00 0.41
DCH-CHL16-15A November 6, 2016 60.00 847 0.00 0.36
DCH-CHL16-16A November 6, 2016 89.00 847 0.00 0.41
DCH-CHL16-17A November 6, 2016 85.00 847 0.00 0.35
DCH-CHL16-18A November 6, 2016 79.00 847 0.00 0.41
DCH-CHL16-19A November 6, 2016 70.00 847 0.00 0.40
DCH-CHL16-1A November 20, 2016 87.65 847 0.00
DCH-CHL16-1B November 20, 2016 87.65 847 0.00
DCH-CHL16-1C November 20, 2016 87.65 847 0.00
DCH-CHL16-1D November 20, 2016 87.65 847 0.00
DCH-CHL16-1E November 20, 2016 87.65 847 0.00
DCH-CHL16-1F November 5, 2016 89.00 847 0.00 1.03
DCH-CHL16-1G November 6, 2016 89.00 847 0.00 0.42
DCH-CHL16-1H November 6, 2016 89.00 847 0.00 0.41
DCH-CHL16-1Z November 20, 2016 87.65 847 0.00
DCH-CHL16-20A November 6, 2016 65.00 847 0.00 0.37
DCH-CHL16-21A November 6, 2016 60.00 847 0.00 0.35
DCH-CHL16-22A November 12, 2016 89.00 847 0.00 0.40
DCH-CHL16-23A November 12, 2016 85.00 847 0.00 0.39
DCH-CHL16-24A November 12, 2016 80.00 847 0.00 0.44
DCH-CHL16-25A November 12, 2016 81.00 847 0.00 0.49
DCH-CHL16-26A November 12, 2016 80.00 847 0.00 0.38
DCH-CHL16-27A November 12, 2016 80.00 847 0.00 0.38
DCH-CHL16-28A November 12, 2016 85.00 847 0.00 0.46
DCH-CHL16-7A November 6, 2016 79.00 847 0.00 0.43
DCH-CHL16-8A November 6, 2016 65.00 847 0.00 0.44
DCH-CHL16-9A November 6, 2016 88.00 847 0.00 0.40